Ensure you have proper ventilation while waterproofing floors by opening any available windows and running one or more fans.
Proper technical waterpoofing of shower floor in timber construction.
It s an elegant upgrade to the materials of yore and much more versatile.
If the bathroom floor contains any wood the entire bathroom floor must be waterproofed.
In addition check for level and pitch to create adequate drainage.
Any issues with this as it s on a second floor consisting of floor boards and joists.
Timber based flooring is particularly susceptible to the effects of water and must be protected with an impervious surface.
Points in acceptable solution e3 as1 include.
Vacuum or sweep the floor until it is completely clean.
Enter the wooden floor shower.
Under building code clause b2 durability waterproofing systems under wet area tiling must have a durability of at least 15 years.
For a bathroom or other wet area room with a tiled floor laying a waterproof membrane across the entire floor and extending it up all walls for at least 150 mm is recommended.
Pre sloped pans made for using with tile eliminates the need to mud or calculate the proper slope for drainage.
The floor and frame must be built to industry standards.
Wood slats create a cozy ski lodge vibe in winter and a sunny deck like experience in summer making it a win win for anyone looking to spiff up a bathroom design.
A waterstop see figure 4 should be provided where the membrane terminates at adjacent spaces such as.
The step down from the shower to the floor must be waterproofed to a height of at least 100 mm.
If the bathroom is not on the ground floor the entire bathroom floor must be waterproofed.
Tiled shower on second floor timber floor boards will be installing a hob from hebel blocks and creating a mortar base on tile underlay then tiling.
Only a few companies make these foam or plastic trays so they may be difficult to find.
Tiles must have a water absorbency of no more than 6.
Be thorough in this step.
First make sure that the foundation is solid.
Figure 3 level access shower entry falls formed in floor.
Therefore floors in these areas are expected to be exposed to regular low levels of wetting in localised spots.
There are many construction steps involved in the build but here i will discuss one of the earliest steps building the shower pan.
All shower floor and wall finishes must be impervious in other words they must not allow water to pass through.
Then carefully plan drain placement to ensure proper water removal.
A shower pan works as a waterproof dam sloped toward a drain.
Before even starting the process of waterproofing it is important to prepare the substrate.
There are several ways to make a shower pan waterproof a pre made pan can be used made of plastic or concrete.
Different types of waterproofing.